It may seem reasonable to want to make the new cabinets you have chosen for your kitchen instead of below them, believing that this allows you to save money on colorful ceramic tiles. That’s not the case, though.
However, doing so may lead to problems in the future, such as damage to the water or dishwasher that is permanently closed and it is very difficult and time-consuming to repair.
To avoid such problems, we do not have to do what we want.
Continue reading to learn why you should keep the tile under your cabinet unless an exceptional location prevents it from doing so.
There are no predefined sequences in which you need to install each component; However, there are several reasons we recommend starting with your tiles.
If any of your accessories such as refrigerator, dishwasher or ice maker, leak water, having cabinet above the tiles prevents water from reaching under the cabinet.
Water may be trapped under your cabinets, causing problems with mold or mildew on the nursing lines or flooring.
If you put tiles first, the water doesn’t get a chance to split between the tiles and the subcategory, which is sort of accelerating the spill development process.
If you install the cabinets directly below the ground, you will decrease the overall height of the cabinets.
The height of your cabinets should be between 34 and 36 inches, this is the standard height for construction and the purpose is to work with various types of home appliances, including dishwasher.
You have the option to choose short or longer cabinets to meet your family’s needs.
If you install your cabinets before tiles, your tile installation professional will be chosen to save time, which in turn will save you money on labor costs.
That’s because they don’t have to break the tiles in order to set the tiles to fit the tiles.
If you install your own accessories at the top of the end floor, it will be much easier to remove and replace them when the maintenance time comes.
If the item is pressed down after the floor installation and installed on the tile, you may find that you should try to remove it from the floor and cabinets, and you may even risk damaging some tiles in this process.
If this happens, you’ll risk replacing some tiles.
If you decide to change your cabinets in the future as part of a renovation project, installing your tile before the project starts will help the process much faster and easier.
If you want to change the layout of your kitchen, you don’t have to delete the old tile, install the new tile, or remove cabinets from the subcategory, because your tile is already fully set and is ready for the new cabinet to install on it.
Since the installation of the tile will initially require the cost of installing the tile, which will probably be hidden behind household appliances and cabinets, you need to pay for the installation of the tile.
If the additional charge is causing problems, you can install your cabinet before anything else.
If you install the thicker floor after installing your cabinet, such as solid hardwood or ceramic tiles, this may cause the floor not to fit on the cabinet edges.
On the other hand, installing your cabinets on the subfloor may cause your cabinets to be very high.
If you want to install your cabinets first, you may want to think about the use of floor material that has less thickness, such as luxury vinyl, laminate or engineered wood.
A skilled flooring installation specialist is able to offer a suggestion about the type of flooring material that works best in your home if you don’t know which option is the best.
You also have option to use plywood racks or install a cheaper flooring under cabinets and appliances.
Both of these are good alternatives.
If at some stage of the future your kitchen effect has changed, you should replace this
Replacement flooring so that it’s compatible with the rest of the room.
If the tile is installed, a trained professional can choose whether to put the tiles at the bottom.
As the last step in the design process, it will be made sure that the tile flooring is not possible to be damaged by other contractors, heavy equipment or tools.
If you only change tiles but not cabinets, you should check the subfloor for any indication of water damage before starting to replace tiles.
In this way, you prevent the grains from being milled or milled, making the problem worse.
If your dishwasher needs maintenance in the future, placing tiles in the surrounding area may pose challenges.
If the tile is higher than the equipment’s feet, the equipment may need to be removed from the floor.
This might be an expensive effort if the tiles are made of expensive materials, such as granite.
To fix this problem and make it easier to remove the dishwasher, increase the height of the dishwasher by putting plywood under it.
Caulk made of silicone should be used in grint place to cover the gap between tile and cabinets.
A dam that is synergy will result in production.
Caulk is flexible and able to withstand natural expansion and contraction, which is the result of temperature fluctuations.
Your comment submitted.